Z-OVR Cable Impedance Test System
Z-OVR Cable Impedance Test System

Z-OVR Cable Impedance Test System

Über dieses Produkt

WebsiteBesuchen Sie die Produktseite
5kA maximum output current (higher overload currents for 2s) Multi-function digital timing system Digital true RMS memory ammeter Solid state switching 200A, 2000A and 5000A loading units Three range outputs on loading units Rugged, compact design Optional trolley mounting of system Secondary injection up to 100A Auxiliary metering input Direct reading CT ratio and polarity The Z-OVR Cable Impedance Test Set is a cable impedance test system for the measurement of impedance of overhead lines and underground cables. The system consists of a separate control unit containing all metering and control functions and an output transformer that provides isolation of the output current and feedback voltage. A current is injected into the line under test and the resultant magnitude and phase angle of the voltage across the line is measured. The current, voltage, phase angle and impedance of the line (Z & X) under test are displayed. In addition, the harmonic content of the voltage and current can be displayed. The unit has data logging facilities using a standard USB memory key. Date, time, current, voltage, phase angle, and frequency are stored to a CSV file on the memory key along with a comment entered using the supplied USB keyboard. Pressing the “store” pushbutton causes a new set of values to be written to the CSV file. The output has three taps (75V, 150V & 300V), allowing the measurement of impedance of a wide range of lines and cables. All metering is true rms. Four current ranges (2.000, 10.00, 20.00 and 100.0A) and three voltage ranges (10.00V, 30.00V and 300.0V) are provided. The output transformer unit uses 6mm safety connectors for all outputs and 4mm safety connectors for inputs. A block of connectors is provided adjacent to the output to allow easy parallel connection of cables for parallel measurements on all three phases. The Z-OVR Cable Impedance Test Set is provided with a set of four 10m 12mm2 duplex measurement cables. These provide a 12mm2 conductor for current injection and a 6mm2 conductor for voltage feedback in each cable. WEIGHT 26 kg DIMENSIONS 450 × 275 × 305 mm SUPPLIED ACCESSORIES Earth lead Spare fuse set Operating manual USB keyboard USB memory key Mains lead 5 metre long 1 x 10m Earth Kelvin connection lead 3 x 10m Overhead Kelvin connection leads Link lead to connect parallel connection block Power and metering interconnection leads 5 metre long OPTIONAL ACCESSORIES Trolley mounting system, Part no. A204-0005
Ähnliche Produkte
1/15
PCU1-SP MK3 Primärstrom-Einspritztestsystem
PCU1-SP MK3 Primärstrom-Einspritztestsystem
Der PCU1-SP Mk3 ist ein vielseitiges Primärstrom-Injektionstestsystem, ideal für Stabilitäts- und Leistungsschaltertests, mit direkter Ablesung von Wa...
DE-16562 Hohen Neuendorf/OT Bergfelde
HT Instruments GSC53N Multifunktions VDE 0100-Tester mit 3-Phasen Netzanalyse
HT Instruments GSC53N Multifunktions VDE 0100-Tester mit 3-Phasen Netzanalyse
Messung + Kontrolle nach VDE0100, VDE0105, EN61557 + EN50160. Multifunktionsprüfgerät inkl. 3 Phasen Netz- + Leistungsanalysator,Oberwellenermittlung...
DE-16562 Hohen Neuendorf/OT Bergfelde
GSC57 – Multifunktions VDE 0100-Tester + 3-Phasen Netzanalyse + 10A Niederohmmessung
GSC57 – Multifunktions VDE 0100-Tester + 3-Phasen Netzanalyse + 10A Niederohmmessung
Zur Messung, Analyse und Kontrolle nach: VDE0100, VDE0105, EN61557 und EN50160. Bei den Messgeräten der GSC Serie handelt es sich um innovative Mul...
DE-16562 Hohen Neuendorf/OT Bergfelde
DRTS 6 Automatic relay test set
DRTS 6 Automatic relay test set
Main features Multi-tasking relay test equipment designed for testing protection relays, energy meters, transducers Output: 6×15 A (80 VA); 4×300 V ...
DE-16562 Hohen Neuendorf/OT Bergfelde
PCU1-SP MK2 Primary Current Injection Test Set
PCU1-SP MK2 Primary Current Injection Test Set
5kA maximum output current (higher overload currents for 2s) Multi-function digital timing system Digital true RMS memory ammeter Solid state switc...
DE-16562 Hohen Neuendorf/OT Bergfelde
DRTS 3 PLUS Automatic relay test set
DRTS 3 PLUS Automatic relay test set
DRTS 3 PLUS power system simulator is designed to give the highest accuracy when testing and calibrating protective relays, energy meter, transducer a...
DE-16562 Hohen Neuendorf/OT Bergfelde
I-V500w – Peakleistungs & I-U Kennlinienanalysator für PV Module & Strings bis 15A / 1500V DC
I-V500w – Peakleistungs & I-U Kennlinienanalysator für PV Module & Strings bis 15A / 1500V DC
I-U Kennlinienmessung bis 1500V/15A** Leistungsmessung der Module und Strings Leerlaufspannung (VOC) bis 1500V Kurzschlussstrom (ISC) bis 15A Eins...
DE-16562 Hohen Neuendorf/OT Bergfelde
eKAM Electronic primary injection test set
eKAM Electronic primary injection test set
eKAM is the new fully automatic electronic primary injection test equipment. e KAM test system includes two portable units: one control unit with a la...
DE-16562 Hohen Neuendorf/OT Bergfelde
ART3V RELAY TEST SYSTEM
ART3V RELAY TEST SYSTEM
3-f Voltage output from 1-f supply 0-450V f-N output voltage 20VA/phase maximum output Variable Frequency 30-999.9Hz Phase shift ±180.0° Multi-fu...
DE-16562 Hohen Neuendorf/OT Bergfelde
HT Instruments GSC60, VDE0100 Installationstester
HT Instruments GSC60, VDE0100 Installationstester
VDE0100 Installationstester & 3 Phasen Netz-/ Energieanalysator CAT IV mit Farb-Touchscreen und WLAN Elektroinstallationen gemäß VDE 0100 / VDE 0105 ...
DE-16562 Hohen Neuendorf/OT Bergfelde
GSC60 – VDE0100 Installationstester & 3 Phasen Netz-/ Energieanalysator CAT IV mit Farb-Touchscreen und WLAN
GSC60 – VDE0100 Installationstester & 3 Phasen Netz-/ Energieanalysator CAT IV mit Farb-Touchscreen und WLAN
Ein Messgerät für alle elektrischen Sicherheitstest gemäß VDE 0413 (EN61557) Teil 2, 3, 4, 5, 6 und 7 Schutzleiter-Durchgangsprüfung mit >200 mA Prüf...
DE-16562 Hohen Neuendorf/OT Bergfelde
100A/E MK3 Secondary Current Injection Test Set
100A/E MK3 Secondary Current Injection Test Set
0-100A output current True RMS metering with single cycle capture Auxiliary DC and AC output Multi-function auto-ranging timing system Current lim...
DE-16562 Hohen Neuendorf/OT Bergfelde
T 3000 Primary current injection test set
T 3000 Primary current injection test set
T 3000 is a primary current injection testing system designed to perform primary tests requested in substations commissioning. It allows to perform di...
DE-16562 Hohen Neuendorf/OT Bergfelde
GSC60 – VDE0100 Installationstester & 3 Phasen Netz-/ Energieanalysator CAT IV mit Farb-Touchscreen und WLAN
GSC60 – VDE0100 Installationstester & 3 Phasen Netz-/ Energieanalysator CAT IV mit Farb-Touchscreen und WLAN
Ein Messgerät für alle elektrischen Sicherheitstest gemäß VDE 0413 (EN61557) Teil 2, 3, 4, 5, 6 und 7 Schutzleiter-Durchgangsprüfung mit >200 mA Prüf...
DE-16562 Hohen Neuendorf/OT Bergfelde
COMBI521 – Installationstester mit Auto-Sequenz, RCD TYP B, inkl. EVSE Prüfablauf für Ladesäulen, Wi-Fi
COMBI521 – Installationstester mit Auto-Sequenz, RCD TYP B, inkl. EVSE Prüfablauf für Ladesäulen, Wi-Fi
AUTO-Sequenz (Ra → RCD → Riso) Niederohmmessung mit >200 mA DC Isolationsmessung (L-PE / L-N / N-PE) Polarisationsmessung (PI & DAR) RCD Typ A, AC...
DE-16562 Hohen Neuendorf/OT Bergfelde

Die wer liefert was (wlw)-App ist da!

Nutzen Sie unsere verbesserte Anbietersuche oder erstellen Sie Ihre Anfragen jetzt auch mobil mit der neuen wlw-App für Einkäufer.

Jetzt im App Store herunterladen

App StoreGoogle Play